Skip to content Skip to footer

The Hotel Millepini combines its name to the one of Y-40, the deepest swimming pool in the world, an attraction for professionals and fans of diving from all over the world.

After having successfully participated at the renovation of the indoor and outdoor pools of the hotel, Preformati Italia has been involved in the project of expansion of the spa of the same accommodation facility. This has included the creation of a cave inside the hill adjacent to the outdoor pool.

Preformati Italia has engineered and produced the system of circular benches and compensations installed inside the cave. The use of EPS and the experience of the company’s workers have allowed us to give precise shape to the hydromassage seats, installing and testing in the company the technologies provided (more than 60 elements between hydromassage nozzles, spotlights and buttons).

LocationMontegrotto Terme (PD)Type of workhydromassage benches and overflow on cave zoneMeasures9 x 15,8 x h. 1 mFinal coveringTiles and mosaicShare